DKW Engineering, Portsmouth, saves over £6k a year using Solar PV

DKW Engineering now generates over 56,000 kWh of electricity and reduces its carbon footprint by 33.7 tons of CO2 a year

Based in Portsmouth, Hampshire, DKW Engineering wanted to reduce their electricity bills through Solar PV.

Infinity Energy Services proposed a system comprising of 162 solar panels that reduced their need for imported grid energy by 11.0%. We also recommended advanced power optimiser technology from SolarEdge, to minimise the effect on performance from shade caused by trees.

DKW Engineering

THE SYSTEM – A BRIEF OVERVIEW

Solar Panels

Electricity generation

56,000 kWh per year
Environmental benefits

CO2 emissions saved

33.7 tons per year
Payback period

Payback period

6.1 years

The SolarEdge system also provides state-of-the-art monitoring, allowing DKW Engineering to see the performance of every panel in real-time.

Infinity Energy Services installed a Solar Panel system with 365W mono-crystalline panels along with a 55 kW inverter.

DKW Engineering

A project payback period of only 6.1 years

Thanks to Infinity Energy Services’ expertise on all kinds of commercial installations, DKW Engineering can now use renewable energy that provides excellent savings on annual electricity costs, and a project payback period of only 6.1 years.

ELECTRICITY BILL SAVING
£6,166 per year
PROFIT AFTER 20 YEARS
£290,881
PROJECT PAYBACK
6.1 years
DKW Engineering

DKW Engineering was able to save 33.7 tons of CO2 each year, and their saving of £6,166 on their previous electricity bill would make an incredible profit after 20 years of more than £290,000.

David Lewis, Infinity Energy Services