See how an IT company switched over to Solar PV, cut their energy bills and reduced carbon emissions…
IT specialists Medhurst Communications in Segensworth, Hampshire were keen to switch to a renewable energy source, reducing their electricity bills and also their CO2 emissions. Installing a Solar PV system would not only meet their requirements, but also future proof the company from the escalating energy price rises.
THE SYSTEM – A BRIEF OVERVIEW
Following a site visit and detailed survey, we proposed a system to Medhurst Communications that saved them 16,102 kg CO2 emissions per year and also saved the company an incredible £4,419 a year in electricity bills. (Based on 11p /KWh tariff and including generation FIT).
The 110 solar panels we installed will generate over 28,000 kWh of electricity per year.
A PROJECT PAYBACK OF ONLY 6 YEARS
Infinity Energy installed a Solar Panel system with 270W poly-crystalline panels along with a 30 kW inverter.
The system will provide Medhurst Communications an excellent return on their investment, with a project payback period of only 6 years.
ANNUAL ELECTRICITY SAVING | £4,419 |
PROFIT AFTER 20 YEARS | £147,675 |
PROJECT PAYBACK | 6 YEARS |
HOW THE PROJECT CAME TOGETHER
OUR REVIEWS SPEAK FOR THEMSELVES
FIND OUT MORE
AWARD WINNING PRODUCTS AND SERVICE
Solar Panels
LED Lighting
Battery Storage
Air Conditioning
Call 0800 909 8882
for more information, or contact us online